No-Weld Piping

The replacement piping at this pumping station was epoxy lined. That meant there were to be no weld fit-ups when installing. Laser Scanning was used to ensure all fabricated parts had a perfect fit to existing equipment when installed.

J-Tech Laser Scan Projects

S5 Box